Porting Powerhouse code

Mike McCallum mikem@kirk.nt.ca
Thu, 22 Oct 1998 14:11:48 -0600


Has anybody ever been through a project to take an application written in
Powerhouse version 7.29 for the HP3000 MPE/ix environment using TurboImage
(or Image/SQL) and ported it to whatever version of Powerhouse runs with an
HP ALLBASE/SQL or Oracle database on an HP9000 machine?

If so, is there any commonly used formula standard for estimating the time
required to convert source programs in this manner?

Thanks in advance.

Mike McCallum, B.C.Sc., MCSE
Senior Project Leader, KIRK Computer Systems Ltd.
PO Box 1976
Yellowknife, NT   CANADA    X1A 2P5
Phone: (867) 669-6803
Fax:     (867) 920-4451
E-mail:  mikem@kirk.nt.ca
Website: http://www.kirk.nt.ca


= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Subscribe: "subscribe powerh-l" in message body to majordomo@lists.swau.edu
Unsubscribe: "unsubscribe powerh-l" in message to majordomo@lists.swau.edu
powerh-l@lists.swau.edu is gatewayed one-way to bit.listserv.powerh-l
This list is closed, thus to post to the list, you must be a subscriber.