COMMIT points and defer linkpage
Bob Deskin
Bob.Deskin at ca.ibm.com
Mon Nov 22 08:54:27 CST 2010
There should be no difference between PowerHouse Web and PowerHouse 4GL.
And even though the PHWebServer doesn't normally terminate, at the end of
a page it's at the screen ID prompt, so any pending transactions would be
committed.
Bob
From: Peter Bateman <peterbateman808 at hotmail.com>
To: PowerHouse List <powerh-l at lists.sowder.com>
Date: 2010-11-20 02:43 PM
Subject: COMMIT points and defer linkpage
Sent by: powerh-l-bounces+bob.deskin=ca.ibm.com at lists.sowder.com
Hi all:
I had a phwebserver go nuts yesterday. It was consuming 98% of the CPU
for 10 minutes.
The log didn't tell me much.
The program that was running has a procedure POSTUPDATE with some accepts
and a defer linkpage in it ( no LOCAL option).
In this scenario when will the UPDATE transaction be commited?
I am temped to place a COMMIT UPDATE just before the accepts just because
I don't want the transaction open
while users are entering data.
Another possiblity would be to place the accepts and the defer linkpage
in a designer procedure and PUSH the
designer procedure from the POSTUPDATE thus causing the UPDATE
transaction to commit.
Thanks,
Peter
--
= = = = = = = = = = = = = = = = = = = = = = = = = = = =
Mailing list: powerh-l at lists.sowder.com
Subscribe: 'subscribe' in message body to
powerh-l-request at lists.sowder.com
Unsubscribe: 'unsubscribe <password>' in message body to
powerh-l-request at lists.sowder.com
http://lists.sowder.com/mailman/listinfo/powerh-l
This list is closed, thus to post to the list you must be a subscriber.
Add 'site:lists.sowder.com powerh-l' to your search terms to search the
list archive at Google.
More information about the powerh-l
mailing list