sysdate problem
Chris Sharman
Chris.Sharman@ccagroup.co.uk
Mon, 8 Feb 1999 12:45:54 +0000
>We are running PH 8.19 C3 on HP3000. There seems to be a problem
>with sysdate in PH. If we stream a job ex. today the 8 feb. 1999 to start
>at 2.00 AM, sysdate will still be the 8. feb. 1999 at 2.00 AM!
>Systime is ok but sysdate doesn, t change at midnight. Does anybody know
>of the problem?
When does it actually run ?
I don't know HP, but if I have a job which runs at 2:00am, then resubmits
itself to run at 2am, as you suggest, it will run immediately (& continuously):
I'd have to specify a date too if I meant tomorrow. On VMS, execution times in
the past result in running immediately.
Hard to believe this is a Powerhouse problem, since the job (& PH) shouldn't be
active at midnight.
______________________________________________________________________
Chris Sharman Chris.Sharman@CCAgroup.co.uk
CCA Stationery Ltd, Eastway, Fulwood, Preston, Lancashire, PR2 9WS.
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Subscribe: "subscribe powerh-l" in message body to majordomo@lists.swau.edu
Unsubscribe: "unsubscribe powerh-l" in message to majordomo@lists.swau.edu
powerh-l@lists.swau.edu is gatewayed one-way to bit.listserv.powerh-l
This list is closed, thus to post to the list, you must be a subscriber.