Problem with Date(days()) functions

pickerij@norbord.com pickerij@norbord.com
Thu, 8 Apr 1999 11:22:02 -0500


jay_northrop@yahoo.com answers ...

>Upon looking at my original program again, I find
>that I made an error in my original post from yesterday.
>The date that I am trying to manipulate is being
>stored as a numeric 6.  Our client stores all of
>their dates as numeric 6.
<snip>
>
>I'm not sure where to go with this.  Any help
>would be appreciated.

Bite the bullet and convert the data and the programs to 8 digit dates.   
Sometimes it looks like more work but in the end I've found that the work   
is about the same but the results are so much cleaner. The reduced cost   
of future maintenance will probably offset the cost of converting the   
data.

John Pickering
Toronto  

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Subscribe: "subscribe powerh-l" in message body to majordomo@lists.swau.edu
Unsubscribe: "unsubscribe powerh-l" in message to majordomo@lists.swau.edu
powerh-l@lists.swau.edu is gatewayed one-way to bit.listserv.powerh-l
This list is closed, thus to post to the list, you must be a subscriber.