Powerhouse UDC on MPE/iX

Tracy Johnson tmj@primenet.com
Mon, 21 Dec 1998 17:44:41 +0000 (GMT)


When converting from PH729C2 to PH819C1 on an MPE box.  I noted the
INTERBASE parameter has been removed (I know full well it is no longer
supported) in the UDC provided by COGNOS.  My question asks how best
should I deal with it?  The parameter was fairly early in the sequence, so
that any parameter used after the 2nd comma (,) need to have that comma
removed.

1)  Should alter the UDC to "back fit" the missing parameter with a
"DUMMY" parameter so that user's won't have to mass change their
scripts(JOBS)?

2)  Should I have have the users mass change their JOB files?

Tracy Johnson
tmj@primenet.com

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Subscribe: "subscribe powerh-l" in message body to majordomo@lists.swau.edu
Unsubscribe: "unsubscribe powerh-l" in message to majordomo@lists.swau.edu
powerh-l@lists.swau.edu is gatewayed one-way to bit.listserv.powerh-l
This list is closed, thus to post to the list, you must be a subscriber.